
Marda Gold Project
Leeuwin Metals Ltd
Western Australia
Gold
Status: Exploration
100% Ownership
Unlocking Value in WA’s Goldfields
Project Location & Area:
-
Located in the heart of Western Australia’s renowned Goldfields, ~120km north of Southern Cross
-
Covers over 500km² of granted mining, exploration, and prospecting licences
-
Excellent access via sealed roads and historical haulage networks
-
Within trucking distance of multiple processing facilities – offering flexible development options
Project History:
-
Previously mined by Ramelius Resources (2019–2023) with production of 143koz @ 1.9g/t Au
-
Eight historical open pits and multiple legacy workings across the project area
-
Over 350,000m of historic drilling completed – including 115,000m RC and 5,000m DD
Value Drivers:
-
Leeuwin's recent review identified 3km of remnant high-grade mineralisation at Marda Central
-
Multiple unmined high-grade intercepts from historical drilling at Marda Central, including:
-
11m @ 6.9g/t Au from 21m (MRC364)
-
9m @ 7.93g/t Au from 41m (MAR074)
-
10m @ 4.42g/t Au from 24m (MAR111)
-
4m @ 14.05g/t Au from 25m (MRB075)
-
22m @ 3.27g/t Au from 98m (PYRC040)
-
12m @ 3.48g/t Au from 24m (MRC320)
-
62m @ 1.94g/t Au from 102m (MRC292)
-
48m @ 1.95g/t Au from 94m (MRC346)
-
20m @ 3.14g/t Au from 75m (DURC016)
-
46m @ 2.2g/t Au from 69m (MRC232)
-
-
Initial drilling underway at Marda Central targeting shallow extensions
-
Four priority zones (Marda Central, North, South, and West) with walk-up drill targets
-
Opportunity-rich setting with both near-mine brownfield upside and underexplored greenfields potential